China Testing Instruments Manufacturer,Whatsapp/Wechat:+8618620373879  Email: 464560351@qq.com

Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module
Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module
Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module
Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module
Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module
Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module
Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module
Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module

Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module

2025-08-04 10:57:09  

Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module

  • Main Features :
  • Serial No. : monica0967
Contact Us For QuotationEmail:  464560351@qq.comWhatsapp&Wechat:+8618620373879

Xtester-X20BC0083 POWERLINK (V1/V2) Controlled Node I/O Configuration and Firmware Update Via the Fieldbus X20BC0083 PLC Terminal Module

Product descriptions from the supplier

Product Description

MATERIAL NUMBER:
X20BC0083

DESCRIPTION:

POWERLINK

 I/O configuration and firmware update via the fieldbus
Integrated hub for economical wiring
The bus controller makes it possible to connect X2X Link I/O nodes to POWERLINK. It is also possible to operate the X2X Link cycle synchronously 1:1 or synchronous to POWERLINK using a prescaler.

Specification

Short description
Bus controller
POWERLINK (V1/V2) controlled node
General information
B&R ID code
0x1F1E



Status indicators
Module status, bus function
Diagnostics_Module status
Yes, using LED status indicator and software
Diagnostics_Bus function
Yes, using LED status indicator and software

图片关键词

Telephone
Email
Map
QQ Chat